System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
302
SI Installation and Upgrades
June 2004
Prepare and install new control carrier [75 small upgrade]
Return to Task List
1
Install the J58890AH control carrier in position A by lining up the plastic alignment tips on the
top rear of the carrier with the screw holes in the cabinet. These alignment tips will support the
carrier while the screws are being installed. Ensure that the power cords are properly placed in
the slots at the sides of the carrier.
CAUTION:
Carefully realign the threads on the self-tapping screws by turning them clockwise a turn
or two before tightening them to avoid stripping the threads out of the framework.
2
Fasten the carrier into position with 4 self-tapping screws saved from the removal of the old
carrier.
3
Connect the P2 and P1 (large and small) connectors to the rear of A carrier. If necessary, to get
enough slack in the cables, cut the tie wrap holding the intercabinet cable from the upright in the
area of the carrier being installed. Snap the connector lock into place to ensure connection is
properly made.
4
Connect the 8 ground straps from the B carrier to the new A carrier (see
Figure 75, Locations of
grounding jumpers,
on page 303). These straps were left connected to the B carrier when the old
A carrier was removed.
5
For the AC-powered control carrier, install the 2 new carrier-ground straps. One strap connects
ground point 1 to the A-carrier frame (on the right side), and the other connects ground point 8 to
the A-carrier frame (on the left side).
6
Connect the new TDM/LAN cable (WP-91716 L6) between the A and B carriers (see
Figure 76,
TDM/LAN connections for R7si/R8si PPN,
on page 303 and the
Table 13, TDM/LAN
connections,
on page 304 table). The cable is connected to the A and B carriers at the pin-field
blocks marked on the left side of each carrier.
7
Replace the existing bus terminators (AHF1) with the new ZAHF4 bus terminators. (See
Figure
76, TDM/LAN connections for R7si/R8si PPN,
on page 303 and the
Table 13, TDM/LAN
connections,
on page 304 table).
8
Install the front trim plates on the A carrier. Install the fan trim plate.
9
Peel the old decal strip (designation strip) from the trim plates. Then install the new decal strip at
the bottom of the trim panel.
10
Install the connector-panel decal on the rear connector panel.
11
Install the 631-type power units into the A carrier. Install the new 631DB1 in the right side of the
carrier, and reuse the old 631-type power supply in the left side. Do not interchange the units.
The 631AR, 631WA1, or 631DA1 is installed in the left side, while the new 631DB1 is installed
in the right side (see
Figure 77, Locations of power units,
on page 304).
12
If the system is equipped with neon message waiting, install the previously removed TN752 or
TN755B power unit in port slots 12 and 13 of the carrier (adjacent to the 631DB1).
13
Connect the power cords to the power units. The power cords are the white cables equipped with
plugs that are run through the slots in the front of each carrier (see
Figure 78, 631-type power unit,
on page 304).
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...