Install and Connect MCC1 (Multicarrier) Cabinet
Connect Fiber Optic Interconnect Cabling
358
SI Installation and Upgrades
June 2004
Return to Task List
Connect High-Reliability CSS-Connected System with 1 Switch Node
Return to Task List
Figure 106, High-Reliability CSS-Connected with 1 Switch Node,
on page 358 shows typical fiber optic
cabling between cabinets. The cable between the EI and SNI on the PPN cabinet is a pre-installed
metallic cable (H600-278).
Connect the cables between the PPN cabinet and each EPN cabinet in an alternating port slot order: 3, 19;
4, 18; 5, 17; and so forth. Cabinet 1 is a PPN with 1 Switch Node.
Figure 106: High-Reliability CSS-Connected with 1 Switch Node
Return to Task List
Figure notes
1
Cabinet 1 (PPN with 1 Switch Node)
2
Cabinet 2 through 15 (EPN)
3
H600-278 Metallic Cable
4
To other EPNs
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...