Install and Administer Trunks
Add TN1654 DS1 Converter (r only)
SI Installation and Upgrades
683
June 2004
Figure 276: DS1 Converter Connections — Part 1
Return to Task List
Installing TN1654s in a Switch Node Carrier
Return to Task List
You can install up to 2 TN1654 circuit packs in a Switch Node Carrier.
1
Install the TN1654 circuit pack in either slot 1 or 21 of the Switch Node Carrier close to a
TN573B SNI circuit pack.
CAUTION:
Install the TN1654 circuit pack in either slot 1 or slot 21. Installing it in any other slots can
damage the circuit pack and the system. Do not do it.
2
On the backplane, connect a 14-inch (35.56 cm) Y cable from the TN1654 circuit pack to the
TN573B circuit pack. See
Figure 277, DS1 Converter Connections — Part 1,
on page 684.
CAUTION:
The Y cable used with the TN1654 circuit pack is different than the Y cable used with the
TN574 circuit pack. These cables are NOT interchangeable.
Figure notes
1
Port cabinet
2
Backplane connector for TN570D EI
3
Backplane connector for TN1654 DS1
Converter
4
50-pair female connector to EI
connector
5
14-in. (35.6 cm) Y cable
6
50-pin male/50-pin female double-
headed connector
7
H600-348 Quad Cable (with 50-pin
male connector), which connects the Y
cable to the 4 CSUs.
cydf010 KLC 091399
20
19
16
17
18
15
14
13
12
11 10 09
08
07
06
05
04 03
02
01
1
4
5
6
7
A
2
3
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...