Contents
16
SI Installation and Upgrades
June 2004
Sizing 25-Pair and Multiple 25-Pair Station Cables
428
3-Pair Station Cable Circuits
428
4-Pair Station Cable Circuits
428
• Patch Cord/Jumper Installation and Administration
429
Bring the System Online
447
• Task List: Setting up the PC and Administering the System
447
• About Accessing the System
448
• Administration Screens and Commands
448
• Administering the Circuit Packs
449
Administration Commands
449
Change Circuit Packs Form
450
Change Circuit Pack Form Implementation Notes
451
• DEFINITY AUDIX System Power Procedures
451
Manually Power Down AUDIX System
451
Manually Power Up AUDIX System
452
• Access the System
452
• Task List: Access the system
452
• Task List: Make Data Module Settings
452
• Activate the System
460
• Task List: Activate the System
461
• Administer the System
463
• Task List: Administer the System
464
New Duplicated G3r installations only
465
New simplex and upgraded G3r only
465
New or upgraded G3si only
465
Direct connection between the switch and RFA
466
No connection between the switch and RFA
466
Test the System
483
• Task List: Test the System
483
• LED Indicators
484
Attendant Console LEDs
484
Terminal Alarm Notification
484
Circuit Pack LEDs
485
DS1 Converter Circuit Pack LEDs
485
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...