Links and FAQs
Frequently Asked Questions
SI Installation and Upgrades
847
June 2004
Back to top of page
In what order do I power down and power up the cabinets in high and critical reliability
systems? Does it really matter?
It is not necessary to power down the EPN to do an upgrade. (If the EPN is remote, you may not
even know where it is.) The order doesn’t matter for power-down, but it does for power-up. If you
did power down the EPN cabinet, power up it first, then power up the PPN cabinet.
Always power up the control cabinet last.
Back to top of page
How do I troubleshoot DS-1/T1 board tests?
If you are connected to the Avaya intranet, you can check for newer information at
the DS-1 web
page
.
Select DS-1, and then select DS-1 Tests from the list that appears at the lower left of the window.
Back to top of page
How do I set the DIP switch for duplicated systems?
NOTE:
Answer
For an R7/R8 upgrade, you replace the old TN772 duplication board with the new TN792
duplication board, which has a 3-position switch located on its face. Verify that the switch is in the
AUTO (central) position on both boards so the 2 processors can talk to each other.
(To lock the A SPE on line, put the switches on both boards to the A position; to lock the B SPE
on line, put the switches on both boards to the B position.)
Back to top of page
Which flash card do I use in the TN794 NETCON circuit pack when I power up the new
R7si or R8si system?
That depends.... Check the load number on the TN790B circuit pack.
•
If the load number is not the current load number, you must upgrade the Generics. Use the
software memory card (the orange Generic card).
•
If the load number is the current load number, use the customer’s original translation card (the
white card containing translations).
Back to top of page
Can I reuse the TN756 tone clock when I upgrade a System 75XE?
With the TN756,
links and/or PRI may not come up. A newer tone clock (TN768 or TN2182)
should have been provided.
Back to top of page
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...