Install and Connect SCC1 (Single-Carrier Cabinets)
Task List: Install and Connect Single-Carrier Cabinets (SCC1)
SI Installation and Upgrades
367
June 2004
Install Earthquake Protection for SCC1
Return to Task List
Earthquake protection installs only on SCC1 (Single-Carrier Cabinets).
1
Position the Control Cabinet (J58890L) in the position it is to occupy when the installation is
complete. Be sure the cabinet is level.
2
Using a pencil or marker and using the Front Mounting Angle as a template, mark the locations of
the two floor mounting holes.
3
Move the cabinet out of the way and drill a hole 0.5-inch (1.3 cm) in diameter and 1.5 inches (3.8
cm) deep at the locations marked in Step 2.
4
Insert a concrete floor anchor (STARR part number 3425) into each hole.
5
Secure the Front Mounting Angle to the floor using the short hex head bolts provided.
6
Move the cabinet back into place.
7
At the rear of the cabinet, remove the two hole plugs from the bottom of the cabinet. See
Figure
108, Cabinet Earthquake Mounting — Rear View,
on page 368.
8
Insert a pencil or marker through the holes in the bottom of the cabinet and mark the floor directly
beneath each hole.
9
Move the cabinet out of the way and drill a hole 0.5-inch (1.27 cm) in diameter and 1.5 inches
(3.8 cm) deep at the locations marked in Step 8.
10
Insert a concrete floor anchor (STARR part number 3425) into each hole.
11
Move the cabinet back into place and align with the Front Mounting Angle.
12
Attach the cabinet to the Front Mounting Angle using the four supplied #12-24 x 1/2-inch (1.27
cm) thread-forming screws. See
Figure 109, Front Mounting Angle Location,
on page 369.
13
Lay the supplied Stiffener on the bottom rear of the cabinet and align with the holes in the bottom
of the cabinet. See
Figure 108, Cabinet Earthquake Mounting — Rear View,
on page 368.
14
Slide a nylon washer onto each of the two supplied long hex head bolts.
15
Insert the bolts through the Stiffener and thread into the concrete floor anchor. Tighten securely.
NOTE:
For a critical reliability installation, position the Expansion Control Cabinet on the floor
next to Control Cabinet A. Repeat the procedure steps.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...