Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect DC Power and Ground
348
SI Installation and Upgrades
June 2004
3
Tie wrap the ground wire to the inside wiring cable.
NOTE:
The ground wires are connected to the CBC as instructed in
Install Telecommunications
Cabling
.
Return to Task List
Connect DC Battery and Power Cabinet Grounds
Return to Task List
NOTE:
The wire in the next step must be sized for a maximum voltage drop of 0.5 VDC in each
leg of the DC distribution. In this example 1 AWG is used.
1
Measure and cut a minimum of a 1 AWG (#70) (44 mm
2
) wire long enough to reach between the
ground connection terminal in the DC Battery Cabinet and the Ground Discharge Bar in the DC
Power Cabinet. See
Figure 95, Typical Power and Ground for a DC-Powered Cabinet,
on page
344.
2
Crimp terminal lugs on each end of the wire. Terminal lugs are furnished as part of D-181895, Kit
of Parts.
3
At the DC Power Cabinet, connect the wire to the Ground Discharge Bar.
4
Route the wire through 1 of the holes in the side of the cabinets and terminate it on the Ground
Connection Terminal in the DC Battery Cabinet.
Return to Task List
Connect DC Power Cabinet Approved Ground
Return to Task List
NOTE:
The wire must be at least as large as the largest distribution wire in the system (required by
UL). In this example 1 AWG is used.
1
At the DC Power Cabinet, connect a 1 AWG (#70) (44 mm
2
) ground wire to the Ground
Discharge Bar. See
Figure 95, Typical Power and Ground for a DC-Powered Cabinet,
on page
344.
2
Route the ground wire out of the cabinet and terminate it on the approved ground. The approved
ground must be identified with a grounding tag (FORM 15657NR or equivalent). See
Approved
Grounds
.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...