Install Telecommunications Cabling
Patch Cord/Jumper Installation and Administration
SI Installation and Upgrades
429
June 2004
Patch Cord/Jumper Installation and Administration
Before starting the patch cord installation, obtain a copy of the Port Assignment Record forms from the
customer or marketing representative. See
Figure 152, Port Assignment Record Form,
on page 429.
These forms contain the port assignments and identify the extension numbers (
Terminal No.
) of the
telephones/voice terminals. Enter the jack assignments at the equipment room and indicate if adjunct
power is required and where it is provided (MDF, site/satellite closet, or information outlet).
When satellite locations are provided, enter the satellite letter designation (A through F) and the jack
appearance in the equipment room on the form. Also, enter the floor designation and/or building
designation if appropriate. For 1-point administration, this entry is all that is required.
The white label identifying the terminal block row associated with circuits 17 to 24 connects to an
identically labeled terminal block row at the satellite closet. See
Figure 153, Example 3-Pair Labeling to
Information Outlet,
on page 430. This is always the case for either 1-point or 2-point administration.
The satellite symbol must be installed at all connection points between the blue field and the information
outlet. It must also be installed at the information outlet itself.
Figure 154, Example 4-Pair Labeling to Information Outlet,
on page 431 shows an example labeling
scheme for 4-pair circuits from the equipment room to the information outlets. The labeling scheme for 3-
pair circuits from the MDF to a satellite location.
Figure 152: Port Assignment Record Form
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Slot
CKT PK
Type
Slot
Port
Jack*
Old
New
Type
Color
Module
Power*
User Name/Use
Extension
Number
Voice
Terminal
Bldg
Flr
Rm
Voice
Terminal
Adjunct
CARRIER
Page
PORT ASSIGNMENT RECORD
* To be completed by installation technician
r764787 PDH 071596
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...