Install Telecommunications Cabling
Patch Cord/Jumper Installation and Administration
440
SI Installation and Upgrades
June 2004
Figure 161: 1110A2 and 1110C1 Apparatus Mountings
Return to Task List
r781401 LJK 040896
Figure notes
1
1110C1 Apparatus Mounting
2
1110A2 Apparatus Mounting
3
76 in. (193 cm)
4
88.5 in. (225 cm)
5
43.5 in. (110.5 cm)
Apparatus Mounting Frame Information
Code Number
Description
1110A2
Apparatus Mounting Frame
1110C1
Cable Support Assembly
1110A1
End Dress Panel
2110A1
Top Dress Panel
2110B1
Bottom Dress Panel
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...