Install and Wire Telephones
Task List: Typical Emergency Transfer Panel and Telephone Installation
SI Installation and Upgrades
535
June 2004
Figure 208: 808A Emergency Transfer Panel Mounting
Install the 808A Emergency Transfer panel
Return to Task List
NOTE:
The 808A must be installed in a location that can be accessed only by authorized
personnel. The location must meet standard environmental considerations such as
temperature, humidity, and so forth.
1
Verify dial tone is present at each trunk circuit.
2
Locate the circuit start selection switches (see
Figure 209, 808A Emergency Transfer Panel,
on
page 537).
These are the first 10 two-position switches on the left side of the Emergency Transfer Panel.
They are used to set each of the five incoming trunk lines to either loop start or ground start. Two
switches are used for each circuit; switches 1 and 2 are used for circuit 1, switches 3 and 4 are
used for circuit 2, and so forth. See
Trunk/Test Switches
on page 537.
3
For loop start, set the switches to the left. For ground start, set the switches to the right.
4
Connect a 25-pair cable between the male RJ21 25-pair connector on the Emergency Transfer
Panel and the yellow field of the Main Distribution Frame (MDF).
Pin Assignments for 25-Pair
Connector
on page 538 shows the pinouts.
Figure notes
1
808A Emergency Transfer Panel
2
Ear for Screw Mount
3
Cut-Out for Snap Mount
4
25-Pair Male Connector
5
Circuit Start Switches
808a_em LJK 042396
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...