Install and Connect Modems
Task List: Install and Connect Modems
SI Installation and Upgrades
707
June 2004
11
Slide the tool to the front of the cabinet. See
Figure 292, Insert the Pass-thru Tool,
on page 710.
12
Pull the tool (with adapter and cable attached) out through the front of the cabinet.
13
Close the rear door.
14
Replace the fan cover. See
Figure 293, Replace the Fan Cover,
on page 711.
15
Connect the cable to the front of the TN1648B circuit pack. See
Figure 294, Connect the Cable to
the TN1648B Circuit Pack,
on page 711.
16
Dress the cable straight down the front of the circuit pack. Do not allow the cable to cross in front
of another circuit pack.
17
Attach the cable mount to the cabinet and secure the cable. See
Figure 294, Connect the Cable to
the TN1648B Circuit Pack,
on page 711.
18
Close the front door.
19
Discard the pass-thru tool.
20
Log in as craft.
NOTE:
If you have a dadmin login and password, you can use them instead of craft and the craft
password.
21
Administer the system by referring to the
Chapter , “Adjuncts and Peripherals”
.
22
Type
list configuration all
and press Enter to determine if the new circuit pack appears in the
correct slot and that there are no circuit pack conflicts.
Figure 287: External Modem Pass-Thru Kit Equipment
indakit2 EWS 091498
1
2
3
4
6
5
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...