Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
42
SI Installation and Upgrades
June 2004
Pre-upgrade checklist
Return to Task List
This upgrade may require the following tools and other items:
Return to Task List
Required Tools
No.
Description
1
Software Release Letter
2
Avaya Communication Manager on removable media
3
Extra formatted removable media
4
Authorized wrist grounding strap
5
Documentation (book or PDF file) for the current release:
— Maintenance for Avaya DEFINITY® Server SI (555-233-
123)
— Administrator's Guide for Avaya Communication
Manager (555-233-506)
— Feature Extraction Tool (FET) and License Installation
Tool (LIT) documentation
6
Your personal Single Sign-On (SSO) for RFA website authentication
login.
7
SAP order number with RTUs
8
Look up hardware serial number(s) with the
list configuration
license
(
long
) SAT command. Duplicated configurations require
long
in the command.
9
Transaction Record number
10
System Identification (SID) number
11
Switch telephone number or IP address
12
Access to the RFA Information page for these items (if not already
installed on your PC):
— Features Extraction Tool (FET) application (only for
Release 9si to Avaya Communication Manager.
— License Installation Tool (LIT) application
13
Adobe Acrobat Reader application installed on your PC (to read FET and
LIT documentation)
14
Internet Explorer 5.0 or higher, with high (128-bit) encryption installed
on your laptop/PC
15
Intranet access to your designated RFA portal (see
Go to the RFA
website
).
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...