R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
118
SI Installation and Upgrades
June 2004
NOTE:
The breaker on an MCC is on the bottom front of the cabinet; the breaker on an SCC is on
the back of the cabinet.
1
At the PPN power-distribution unit, set the main circuit breaker to OFF.
2
If the site has a power-failure transfer panel, connect a ground strap to the panel and to a ground
source. Verify that the power-failure stations are working.
Remember to disconnect this strap before reapplying power.
Return to Task List
Verify TDM cables and connectors [from
R5/R6/R7/R8si]
Return to Task List
Verify that the system has the correct TDM/LAN cables and TDM terminators installed. Using this table
as a reference, visually inspect the PPN and EPN connections.
Return to Task List
Remove translation card(s), TN790/B, TN778,
TN777B or TN794 or TN794/TN2400 circuit
packs [from R5/R6/R7/R8si]
Return to Task List
NOTE:
If you are upgrading a duplex installation, remove the circuit packs on both SPEs.
!
WARNING:
Before inserting or removing a circuit pack from a cabinet, put on a wrist strap and attach
its plug or clip to the cabinet’s frame.
Cabinet
TDM/LAN cable
TDM Terminator
SCC1
WP-91716 L3
AHF110
MCC1
WP-91716 L6 and L7 (older cables have blue
labels; yellow labels are newer)
ZAHF4
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...