System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
SI Installation and Upgrades
323
June 2004
•
If the control carrier in the small-cabinet System 75 system contains a TN752 or TN755B power
supply, this circuit pack will occupy port slots 12 and 13 of the new R7si enhanced control carrier.
•
If you simultaneously add an EPN, you must install a TN776 or TN570D expansion interface
circuit pack in slot 1 of the new R7si or R8si enhanced control carrier.
•
If you have both of the above scenarios, the result is either a net loss of 2 port slots (from the AB
carrier) or a net gain of only 2 port slots (from the AA carrier).
Replacing the cabinet and control carrier
When you replace the cabinet and control carrier for a small-cabinet System 75:
•
You need to move and manually retranslate port circuit packs from the small-cabinet System 75
control carrier.
•
A new R7si/R8si control carrier with 9 port slots and new power supplies will replace either:
— An R1V3 J58890AB control carrier in a Model 1 with 12 port slots. This provides 3 fewer
port slots.
— An R1V3 J58890AA control carrier in a Model 2 with 8 port slots. This provides 1 extra
port slot.
•
Out of these 9 port slots, nonport-related circuit packs may need to occupy certain slots.
•
If the control carrier in the small-cabinet System 75 system holds a TN752 or TN755B power
supply, this circuit pack will occupy port slots 8 and 9 of the new R7si/R8si control carrier.
•
If you simultaneously add an EPN, you must install a TN776 or TN570D expansion interface
circuit pack in slot 1 of the new R7si/R8si control carrier.
•
If you have both of the above scenarios, the result is either a net loss of 6 port slots (from the AB
carrier) or a net loss of 2 port slots (from the AA carrier).
Power requirements
See the power and grounding requirements in DEFINITY Communications System Generic 1 and
Generic 3 Installation and Test (555-230-104).
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...