Contents
8
SI Installation and Upgrades
June 2004
No connection between the switch and RFA
84
Administer No-License/Emergency Numbers [from G3V4]
85
Verify the upgrade [from G3V4]
85
Check customer options [from G3V4]
86
High or Critical Reliability
86
All
86
Restore busyouts [from G3V4]
86
Run acceptance tests [from G3V4]
87
Test single-carrier cabinet systems
87
Test multi-carrier cabinet systems
87
Test telephones and other equipment
88
Enable Scheduled Maintenance and Alarm Notification [from G3V4]
88
Register the switch for maintenance [from G3V4]
89
Restore announcements (TN750 or TN750B only) [from G3V4]
91
Rerecord announcements [from G3V4]
92
Save announcements and translation (TN750
or TN750B only) [from G3V4]
92
Return equipment [from G3V4]
93
Helpful links
93
R5/R6/R7/R8si to Avaya Communication Manager
95
• Introduction
95
When to use the TN2401 versus the TN2401/2400 sandwich pack
95
About circuit-pack carriers
97
Before you begin the upgrade
97
Preparation and process steps
97
Make the Blowback Tape
100
• Task List: R5/R6/R7/R8si to Avaya Communication Manager
101
Verify the required hardware [from R5/R6/R7/R8si]
102
Provide the required tools [from R5/R6/R7/R8si]
103
Go to the RFA website [from R5/R6/R7/R8si]
104
G3V4 through Release 9si upgrades only
105
Direct connection between the switch and RFA
105
No connection between the switch and RFA
105
If you have problems with RFA
106
Pre-upgrade administration [from R5/R6/R7/R8si]
106
Verify the software version [from R5/R6/R7/R8si]
107
Verify system status [from R5/R6/R7/R8si]
108
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...