Install Telecommunications Cabling
Patch Cord/Jumper Installation and Administration
SI Installation and Upgrades
433
June 2004
Figure 155: Connect Trunk Pairs Using Concentrator Cables
Return to Task List
Connect Trunk Pairs to Cabinet Using Jumper Wires
To Establish 3-Pair Modularity
Return to Task List
Figure 156, 3-Pair Modularity for Trunk Pairs for 1-Pair Trunks,
on page 434 and
Figure 157, 3-Pair
Modularity for Trunk Pairs for 3-Pair Tie Trunks,
on page 435 show trunk pairs connected to the cabinet
with jumper wires to establish 3-pair modularity.
To connect the trunk pairs to the purple field:
1
Connect B25A cables between the network interface and the sneak fuse panels. See
Figure 156, 3-
Pair Modularity for Trunk Pairs for 1-Pair Trunks,
on page 434.
2
Connect A25D/B25A cables from the sneak fuse panels to the 110-type terminal block-type
connecting block connectors in the green field.
NEW796 THC 031296
Figure notes
1
Trunk/Auxiliary Field
2
To Control Carrier AUX Connector
3
Concentrator Cable (WP90929, List 1)
4
Concentrator Cable (WP90929, List 3)
5
A25D (Male-to-Male) Cable
6
Alternate Block/Rows
7
RJ21X/RJ2GX Network Interface
8
Sneak Fuse Panel
9
B25A Cable
10
Central Office Trunks
11
System Cabinet
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...