Installing the Stratum 3 Clock
Task List: Install the Stratum 3 clock
696
SI Installation and Upgrades
June 2004
NOTE:
Only SW 1 and SW2 are used. SW1 controls the output of alarm signals from the Stratum
3 Clock circuit pack.
NOTE:
Set switches 1 and 2 according to the distance from the Stratum 3 clock to the DEFINITY
System. Set switch 3 to ON. Set switch 4 to OFF.
Return to Task List
Cable the Stratum 3 Clock
Return to Task List
Figure 283, Typical Connections to Stratum 3 Clock,
on page 697 shows typical connections to a Stratum
3 Clock cabinet. Connections are made through the yellow field cross-connect. A custom “Y” cable
(H600-274) connects the CSU to the DS1 circuit pack and taps off the input for the Stratum 3 Clock. A
resistor built into the cable to provides the necessary isolation between the system and the clock. The “Y”
cable plugs directly into the CSU and connects to standard cables for interface to the system and the
yellow field on the MDF.
ST3 Clock Circuit Pack Option Switch Settings
Switch
Status/Results
SW1
Minor Alarm
Control
OFF = minor alarm never output
ON = minor alarm is output if holdover occurs
SW2
Major Alarm
Control
OFF = major alarm is output and fail lamp lights if 5 VDC
power is lost and 4 kHz output is lost
ON = major alarm is output and fail lamp lights if 5 VDC power
is lost and 4 kHz output is lost and holdover occurs
Composite Clock Timing Output (TOCA) Circuit Pack
Switch
Range
500
1000
1 ft
(0.3 m)
500 ft
(152 m)
1000 ft
(305 m)
1500 ft
(457 m)
2000 ft
(610 m)
2500 ft
(762 m)
3000 ft
(914 m)
OFF
OFF
<-------------------------------------------------->
ON
OFF
<----------------------------------------------------
>
OFF
ON
<---------------------------------------------------->
ON
ON
<--------------------------------------------------->
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...