G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
SI Installation and Upgrades
173
June 2004
AC-powered cabinet port carrier power
upgrade compatibility
AC-powered cabinet port carrier power upgrade information
Port Carrier
From Oldest
To Newest &
Product
Used on
Backplane &
Assembly
Comcode
SD/CD
Drawings &
Functional
Difference
From
Previous
Version
Left Hand
Power Slot
(POS 00)
Choices
1.25" Wide
Power Slot
(POS 01)
Choices
Right
Hand
Power Slot
(POS 22)
Choices
J58890BB-
2,L1
R1V1 - R1V3
PWJ58890BB-
1,L2
104 325 410
SD-66982-01
CD-66982-01
-5V only from
POS 01
631AR +5V
631WA +5V
631DA +5V
TN736 -5V
TN752 -5V,-
150V
631BR -48V
631WB -
48V
631DB -
48V, -5V
Backplane
doesn’t wire
-5V to this
POS, so POS
01 supplies
needed for -
5V
J58890BB-
2,L2 or
J58890BB-
3,L2
R1V3,G1 eff.
11/IV/88 week
PWJ58890BB-
2,L3
105 450 514
SD-66982-02
CD-66982-02*
-5V from POS
01 or POS 22
POS 01 now
for service
circuits
631AR +5V
631WA +5V
631DA +5V
TN736 -5V
TN752 -5V,-
150V
631BR -48V
631WB -
48V
Choices for
use with
631DB only:
TN755B-
150V
TN2036 Test
V
631DB -
48V, -5V
J58890BB-
2,L3 or
J58890BB-
3,L3
G1 DC
G2 AC&DC
3rd QTR 1989
PWJ58906BA-
1,L1
105 519 623
SD-66982-03*
CD-66982-03*
Duplicated
Power Ready
No old
supplies
allowed.
See Do Not
Use Note.
631DA +5V
TN755B -
150V
TN2036 Test
V
631DB -
48V, -5V
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...