System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
238
SI Installation and Upgrades
June 2004
Return to Task List
Label cables [75 XE upgrade]
Return to Task List
To make reconnecting the cables simpler and more reliable, label every connector cable associated with
the system (if it is not already labeled).
Return to Task List
Shut down DEFINITY AUDIX system [75 XE upgrade]
Return to Task List
A yellow caution sticker on the system’s power unit notifies you to shut down the AUDIX before
powering down the system.
!
WARNING:
Neglecting to shut down an AUDIX assembly before powering down the system cabinet
where it resides can damage the AUDIX disk.
1
Log into the AUDIX as craft.
NOTE:
If you have a dadmin login and password, you can use them instead of craft and the craft
password.
2
Type
reset system shutdown
and press Enter.
3
Press Enter again to start the shutdown.
The
SHUTDOWN Completed
message displays when the AUDIX is successfully shutdown. This
takes about 2 minutes.
CAUTION:
If leaving AUDIX System in the carrier, back it out about 2 in. (5 cm) to eliminate the
possibility of damage due to power surges.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...