Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect AC power and ground
SI Installation and Upgrades
337
June 2004
5
Repeat connecting each EPN cabinet to the single-point ground block.
6
At the AC load center, connect a 10 AWG (#25) (6 mm
2
) wire to the single-point ground block.
This ground wire will later be tie-wrapped to the trunk cables and connected to the Coupled
Bonding Conductor (CBC) ground block at the MDF.
The Coupled Bonding Conductor (CBC) wires are installed and terminated in
Install
Telecommunications Cabling
.
Figure 89: Typical Cabinet Ground Location
Return to Task List
Ground AC Load Center More Than 50 ft (15.2 m) from Cabinet
Return to Task List
1
Mount the single-point ground block to any surface between the MCC cabinets and the AC load
center single-point ground. The single-point ground block must be mounted to a non-metallic
surface.
Figure notes
1
PPN Cabinet
2
EPN Cabinet (if Installed)
3
6 AWG (#40) (16 mm
2
) CABINET
GROUND Wire
4
Cabinet Ground Terminal Block
5
AC Load Center Single-Point
Ground
6
Less than 50 Wire feet (15.2 m)
7
10 AWG (#25) (6 mm
2
) Ground
Wire to CBC
widmgrnd LJK 092697
1
2
2
3
3
3
4
4
4
5
6
7
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...