Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
SI Installation and Upgrades
51
June 2004
Upgrade software
Return to Task List
Standard Reliability
1
Insert the 48MB, PCMCIA (orange) card in the TN2404 (Netcon/Pkt Intf) circuit pack’s slot.
2
Type
upgrade software
and press Return to upgrade the system software.
Do not press Return again.
3
When the system beeps, it is prompting you to put the original translation card in the TN2404
(Netcon/Pkt Intf) circuit pack’s slot.
NOTE:
You have 2 minutes to replace the software card with the translation card. If you miss this
window, the system comes up without translations. Correct this by inserting the original
translation card into the TN2404 (Netcon/Pkt Intf) circuit pack’s slot and use the
reset
system 3
command at the SAT.
High and Critical Reliability
1
Insert the 48MB PCMCIA (orange) card in the standby SPE.
2
Type
upgrade software
and press Return to upgrade the system software.
3
Do not press Return again.
4
When the SAT beeps, it is prompting you to put the original translation card in the standby SPE.
a
Remove the orange card and replace it with the translation card.
b
Remove the translation card from the active (other) SPE.
c
Insert the 48MB PCMCIA (orange) card into the other SPE.
NOTE:
You have 2 minutes to complete the preceding steps. If you miss this window, the upgrade
aborts, and you must begin again with Step 1 in this section.
SPE interchange occurs (active and standby sides swap roles) and the new software is
present on the active SPE.
5
When the SAT beeps, remove the orange card and replace it with the translation card.
NOTE:
You have 2 minutes to replace the software card with the translation card. If you miss this
window, no corrective action is necessary. Wait until the system is able to achieve
active/standby state.
6
At the login prompt, log into the switch as craft.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...