G3iV4 to Avaya Communication Manager
Introduction
64
SI Installation and Upgrades
June 2004
About circuit-pack carriers
If the system currently being upgraded was originally a System 75, the circuit-pack carrier or cabinet is
no longer supported. This table identifies the obsolete carriers and cabinet.
NOTE:
In some previous upgrades, the control cabinet or carrier replacement was optional. The
replacement is required for this upgrade. Use the upgrade instructions in this section, but
SCC1 Duplication Processor
Cabinet
J58890M-2 List 15
This replaces List 7
SCC1 Duplication Processor
Cabinet (Knock Down)
J58890M-2 List 52
This replaces List 51
Backplane for the J58890M-2
List 15 and List 52 Cabinets
PWJ58890AM-1 List 3
This backplane replaces List 2
MCC1 SI Processor Carrier
J58890AH-2 List 13
This replaces List 10
MCC1 SI Processor Carrier
(Knock Down)
J58890AH-2 List 55
This replaces List 54
Backplane for the J58890AH-2
List 13 and List 55 Cabinets
PWJ58906AA-1 List 4
This backplane replaces List 3
MCC1 SI Duplication Processor
Carrier
J58890AJ-2 List 12
This replaces List 9
MCC1 SI Duplication Processor
Carrier (Knock Down)
J58890AJ-2 List 55
This replaces List 54
Material required in addition to
L55 (Knock Down)
J58890AJ-2 List 56
This replaces List 53
Backplane for the J58890AJ-2
List 12 and List 55 Cabinets
PWJ58906AB-1 List 3
This backplane replaces List 2
Fiber Optic Cable: MCC1 Dup-
Int
848204434
14” cable
Fiber Optic Cable: SCC1 Dup-Int LL2SC-SC-10
107122640
10’ cable
DEFINITY Carrier /
Backplane
Equipment
Notes
Upgrade from
to
J58890AA
J58890AB
(originally System 75 small-
cabinet carriers)
J58890AH carrier
J58890G
(originally System 75XE
cabinet)
J58890L cabinet
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...