Contents
14
SI Installation and Upgrades
June 2004
Installation for MCC1
(Multicarrier Cabinets) Made Easy
325
Install and Connect MCC1
(Multicarrier) Cabinet
327
• Task List: Install and Connect MCC1
327
Install Concrete Floor Mounting
331
Install Raised Computer Floor Mounting
332
• Connect AC Power and Ground
334
• Task List: Connect AC power and ground
335
Power Requirements
335
Power Supply Sources (J58890CE-1, J58890CE-2, and J58890CH-1)
335
Grounding an AC-Powered System (J58890CE)
336
• Connect DC Power and Ground
343
• Task List: Connect DC Power and Ground
343
• Connect Fiber Optic Interconnect Cabling
356
(Single Carrier Cabinets) Made Easy
361
Install and Connect SCC1
(Single-Carrier Cabinets)
363
• Task List: Install and Connect Single-Carrier Cabinets (SCC1)
363
• Ground DC-Powered Cabinets
370
• Task List: Connect the cabinet grounds on the J58890R DC Power Cabinet
and the Single-Carrier Cabinets
370
• Connect DC Power
374
• Task List: Connect the DC power
374
Making DC Power Connections
375
• Task List: Install a J58890CG DC Power Distribution Unit
375
DC Power Connections with DC Distribution Unit
376
Stacking DC Power Cabinets
376
• Ground and Connect AC-Powered Cabinets
382
• Task List: Connect the cabinet grounds on the J58890R DC Power Cabinet
and the Single-Carrier Cabinets
382
• Connect Time Division Multiplexing Bus Cables
385
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...