Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets
Install the fiber optic cable pass-thru kit (SCC1)
SI Installation and Upgrades
205
June 2004
Install fiber optic cable for duplicated SCC1 systems
Return to Task List
1
Remove both back panels from the A and B cabinets. See
Figure 33
.
2
Insert the pass-through tool from the front to the back of either the A cabinet or the B cabinet. See
Figure 34
.
3
Pull the cable through from the back to the front of the cabinet. See
Figure 35
.
4
It is critical to pass the fiber-optic cable through the opening in the A cabinet. See
Figure 36
.
Repeat steps 2 and 3 for the other cabinet.
5
Dress the fiber-optic cable through the openings at the right side of the back panels, to the right of
the duplication interface ribbon cables. See
Figure 37
.
Dress the TDM-LAN cable (not illustrated) through the opening at the left side of the back panels.
6
Connect the fiber-optic cable to the duplication interface circuit pack in each cabinet. Verify that
the circuit pack is the first (left-most) circuit pack in each cabinet. See
Figure 38
.
Figure 33: Illustration 1
16
8
1
AU
X
7
DC
E
PI
TE
RM
DO
T
AL
AR
MS
ALARMS
EM
ER
TR
EMER
TR
AL
AR
MS
ALARMS
EM
ER
TR
EMER
TR
1
prdascc1 KLC 082500
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...