System 75 Small-Cabinet to R8si (Blowback)
Task List: System 75 Small Cabinet to R8si
SI Installation and Upgrades
303
June 2004
Figure 75: Locations of grounding jumpers
Figure 76: TDM/LAN connections for R7si/R8si PPN
SMALL CABINET
CONTROL CARRIER A
PORT CARRIER B
GROUNDING
JUMPERS
TERMINATOR
TDM/LAN BUS
SLOT 21
SLOT 21
PORT CARRIER
CONTROL CARRIER
A
B
TERMINATOR
TDM/LAN BUS
TDM/LAN CABLE
(WP91716 L6)
REAR VIEW
(ZAHF4)
(ZAHF4)
SLOT 03
J58890AH-1 L5
SEE NOTE
J58890BB
NOTE: ON PORT CARRIER J58890BB-1, CONNECT THE TDM/LAN TERMINATOR TO SLOT 02.
ON PORT CARRIERS J58890BB-2 AND J58890BB-3, CONNECT THE TDM/LAN TERMINATOR TO SLOT 01.
IF THE PORT CARRIER HAS BOTH J58890BB-1 AND J58890BB-2 STENCILLED ON IT, TREAT IT
AS A J58890BB-1.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...