System 75 XE to R8si (Blowback)
Task List: System 75 XE to R8si
SI Installation and Upgrades
269
June 2004
4
Ensure that the exposed portion of the TDM/LAN cable that is between the cabinets does not get
pinched.
5
Tighten all screws.
Figure 66: Locations of ground plate cabinet clip and battery
Return to Task List
Install cabinet clip(s) [75 XE upgrade]
Return to Task List
A cabinet clip, used to ground and stabilize the cabinets, is required between each cabinet. Use this
procedure to install the cabinet clips in systems without earthquake protection.
At the front of the cabinets, install the cabinet clip between the cabinets by hooking the clip into the slot
of the upper cabinet and snapping the straight leg of the clip into the slot on the lower cabinet (see
Figure
67
).
CABINET
CLIP
GROUND
PLATE
BATTERY
SIDE VIEW
2-CABINET PORT NETWORK
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...