Adjuncts and Peripherals
Terminal server installation
796
SI Installation and Upgrades
June 2004
Making the connections
Connect the adjunct to the IOLAN+, using the RJ45-to-DB25 cable and the null modem. You can use a
male/female adapter. See
Figure 309
.
Figure 309: Connecting an adjunct to the IOLAN+
Follow these typical steps:
NOTE:
Depending on the adjunct’s connections, you may not need all of these pieces.
1
Connect the null modem adapter to COM1 port on the adjunct.
NOTE:
The null modem is an important element in this setup. Without it, data may not transfer
correctly.
2
Connect the other end of the null modem adapter to the DB25 to RJ45 cable.
3
Connect the RJ45 end to any port on the IOLAN+.
Figure notes
1
C-LAN circuit pack
2
Local area network (LAN)
3
IOLAN+ 104 terminal server
4
Adjunct (system management
terminal or a system printer, for
example)
5
Null modem
6
PC or laptop (for initial administration)
7
DB25-to-RJ45 cable
8
DB25-to-DB9 cable
cydfrcon KLC 021201
1
2
4
DATA CONNECTIONS ONLY - NOT FOR TELECOM USE
1
2
3
4
10BASE-T
5VDC
3
7
7
8
5
5
6
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...