Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
SI Installation and Upgrades
61
June 2004
Save announcements and translations
Return to Task List
1
Insert the translation card(s) into the TN2401 (Netcon/Pkt Intf) circuit pack(s).
2
Type
save announcements
and press Return.
NOTE:
Use this step only for configurations with the TN750 or TN750B announcement circuit
pack. Skip this step for the TN750C or TN2501AP integrated announcement circuit packs,
which contain on-board, nonvolatile memory.
This takes about 45 minutes.
3
Type
save translation
and press Return.
This takes about 20 minutes.
NOTE:
Do not press any keyboard key until after the screen shows the success message. For
example, if you press Enter more than once after typing the command, the second Enter
erases the screen and you never see the success message.
NOTE:
If the
save translation
command fails, do not continue. Record the error code that appears
on the screen and escalate the problem immediately.
Keep the translation media in a safe and secure place.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...