Add IP Solutions
Task List: Install TN2302AP
606
SI Installation and Upgrades
June 2004
Install the Circuit Packs
Return to Task List
CAUTION:
When adding or replacing any hardware, be sure to ground yourself against electrostatic
discharge (ESD) by wearing a grounded wrist strap.
NOTE:
The TN799B/C/DP and TN2302AP circuit packs are hot-swappable, so you do not need to
power down the carrier to install them.
1
Insert the TN799x circuit pack into the port slot identified earlier.
NOTE:
To properly seat the circuit pack, push firmly on the front of the faceplate until the latch
reaches the bottom rail of the carrier. Then close the latch until it is fully engaged.
2
Insert the TN2302AP IP Media Processor into the port slot you reserved for it and seat it properly
(See
Figure 235, TN2302AP IP Interface faceplate,
on page 607).
When you plug in the TN2302AP IP Media Processor, the circuit pack starts to boot. The RED
LED stays on until an IP address is assigned to the circuit pack.
3
Type
list configuration all
and press Enter to verify that the system recognizes the TN2302AP
circuit packs.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...