Install Telecommunications Cabling
Patch Cord/Jumper Installation and Administration
436
SI Installation and Upgrades
June 2004
Install Connector Cables Between Auxiliary Cabinet and MDF
Return to Task List
Auxiliary equipment that connects to the MDF can be mounted inside the Auxiliary cabinet. The
equipment connects to an ED-1E1443-10 (Group 1) intraconnection panel mounted in the cabinet. This
intraconnection panel consists of a 110-type 100-pair wiring block. Auxiliary equipment is connected to
the 110-type wiring block. The wiring block is pre-wired to four 25-pair female connectors mounted on
the outside rear of the cabinet.
1
Install “D” rings on the wall between the cable slack manager and the terminal/connecting blocks
mounted on the MDF.
2
Install a self-sticking port label on the rear of each connector on the B25A connector cable. See
Figure 141, Self-Stick Label on 25-Pair Cable Connector,
on page 414.
3
Labels should be positioned so they will not be obscured by the cabinet connector retainers.
4
At the rear of the Auxiliary cabinet, connect 1 end of the connector cable to the assigned
connector.
5
Route the cable down the rear of the cabinet and through the cable slack manager to the MDF.
6
At the MDF, connect the other end of the cable to the assigned terminal/connecting block
connector.
7
Store the excess cable in the cable slack manager.
8
Repeat Steps 2 through 6 until all cables are installed.
Figure 158: Self-Stick Label on 25-Pair Cable Connector
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...