Label and connect cables [from
R5/R6/R7/R8si]
Return to Task List
1
To make reconnecting the cables simpler and more reliable, label every reusable connector cable
in the system.
2
Install new connector cables, as needed, onto the connectors at the rear of the cabinet.
3
Route the cables to the MDF and cross-connect as needed.
Return to Task List
Disable scheduled maintenance and alarm
origination [from R5/R6/R7/R8si]
Return to Task List
1
To prevent scheduled daily maintenance from interfering with the update or upgrade, type
change system-parameters maintenance
and press Enter.
2
If scheduled maintenance:
— has begun: set the
Stop Time
field to 1 minute after the current time.
— has not begun: set the
Start Time
field to at least 8 hours after the upgrade starts.
CAUTION:
If you do not disable Alarm Origination, the system may generate alarms, resulting in
unnecessary trouble tickets.
3
Type neither in the
Alarm Origination to OSS Numbers
field and press Enter.
Return to Task List
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...