Install Additional Hardware
Add a TN2501AP Announcement Circuit Pack
578
SI Installation and Upgrades
June 2004
Add a TN2501AP Announcement Circuit Pack
Return to Task List
NOTE:
To install a TN2501AP, you must ensure the system is enabled for TN2510AP (VAL)
boards. If the
Maximum VAL boards
field on the Customer Options screen is set to 0,
then you need to obtain and install a new license file before you can install the card.
Installing the pack includes:
1
Verifying the required hardware
on page 578
2
Installing the TN2501AP circuit pack
on page 578
3
Configuring the system for the TN2501AP
on page 579
Verifying the required hardware
Ensure that you have the required hardware:
•
TN2501AP circuit pack
•
Backplane adapter
•
LAN cable
Installing the TN2501AP circuit pack
!
WARNING:
To prevent electrostatic discharge (ESD), be sure to wear a grounding strap while handling
the circuit pack.
1
Remove connector (if any) from the back of the switch cabinet corresponding to the TN2501AP
circuit pack slot.
2
Insert the circuit pack into any port slot and close the latch securely.
At first, both the red and green LEDs are on steady, then the green LED flashes. If there are
announcements on the circuit pack, the amber LED flashes while the announcements are copied
from FLASH to RAM. After approximately 3-5 minutes, all of the top 3 LEDs go out, although
this time is longer if there are announcements already recorded on the circuit pack.
NOTE:
If the TN2501AP or TN750C circuit packs are at the system limit and you insert a VAL
circuit pack, the red LED on that circuit pack stays on, indicating that the system does not
accept it.
3
Connect the Backplane Adapter to the Amphenol connector on the back of the switch cabinet,
corresponding to the TN2501AP circuit pack slot.
4
Connect the LAN cable to the RJ-45 connector on the Backplane Adapter.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...