R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
114
SI Installation and Upgrades
June 2004
Check link status [from R5/R6/R7/R8si]
Return to Task List
This optional step is to make sure the links are in service before and after the upgrade.
1
Type
display communication-interface links
and press Enter. Write down all enabled links.
2
Type
status link
number
and press Enter for each enabled link.
3
Write down which links are enabled and in service.
NOTE:
If any links are enabled and out of service, resolve the problem before continuing the
upgrade.
4
Type
list signaling group
and press Return.
Note the signaling groups listed by number.
5
For each of the signaling groups listed, type
status signaling group
<number>
and press
Return.
6
If any of the links are not up, take the necessary corrective action to restore the link before
continuing with the upgrade.
Return to Task List
Record all links and remove only ISDN
interface links [from R5/R6/R7/R8si]
Return to Task List
For R7 and later, ISDN links move to the Net Packet circuit pack. They are not retranslated. If you are
upgrading from any release earlier than R7, you remove the ISDN links and do not readminister them.
NOTE:
Any BX.25 adjunct links to adjuncts (for example, CMS, AUDIX, INTUITY, or others)
that are to be retained will still reside on the existing TN765 processor interface (P/I) in
the designated P/I slot. Remove the TN765 P/I only if the sales team has specified that all
adjunct connectivity is being migrated to a TN799 Control LAN (C-LAN) circuit pack.
Use this procedure to identify, record, and remove the ISDN links from the communication link and
communication processor forms:
1
Type
display communication-interface links
and press Enter. If any links were administered on
this form, note them.
2
For each link where the
Prot
field is ISDN, record the information in all fields.
If you must back out of the upgrade, you will need this information.
3
For each ISDN link, type
busyout link
[
link
] and press Enter.
4
Type
change communication-interface links
and press Enter.
5
For each link where the
Prot
field is ISDN, type n in the
Enable
field and press Enter.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...