Install and Connect SCC1 (Single-Carrier Cabinets)
Task List: Install a J58890CG DC Power Distribution Unit
378
SI Installation and Upgrades
June 2004
Figure 115: Connections Using DC Power Distribution Unit
Figure notes
1
System Cabinet Stack
2
DC Power Cabinet
3
DC Power Distribution Unit (position
to right of the cabinet stack
4
White Wire (connect to Circuit
Breaker). See inset.
5
Green Ground Wires and Black Wire
(connect to the -48 VDC Return Bus)
6
-48 VDC Bus
7
Inset
8
12 inches (30.5 cm) from floor to DC
Power Distribution Unit
9
DC Power Cable to Power Connector on
Each Cabinet.
10
DC Power Distribution Unit Power Cord
(route to rear of DC Power Cabinet)
11
Route Power Cord Through Sliding Door
12
Circuit Breaker
13
Supplied #10-32 Screw, #10 Star Washer,
and #10-32 Hex Nut
14
Inset Showing DC Power Connector
(Male)
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...