R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
SI Installation and Upgrades
131
June 2004
If the AUDIX remained in the cabinet and the cabinet was not powered down:
6
At the AUDIX console, hold the Crtl key and type cc.
7
Type 5 at the prompt.
In about 2 minutes, the AUDIX boots up.
8
When the system initialization is complete, log in as craft.
NOTE:
If you have a dadmin login and password, you can use them instead of craft and the craft
password.
9
Check for AUDIX System errors.
Return to Task List
Resolve alarms [from R5/R6/R7/R8si]
Return to Task List
1
See your record of customer busy-outs and recreate the pre-upgrade busy-out states.
2
Type
display alarms
and press Enter.
3
Examine the alarm log.
4
Resolve any alarms using the Maintenance for Avaya DEFINITY® Server SI (555-233-123) book.
Return to Task List
Run acceptance tests [from R5/R6/R7/R8si]
Return to Task List
Run any acceptance tests that are appropriate for this upgrade. The acceptance tests are listed in these 3
checklists:
Test single-carrier cabinet systems
Test multi-carrier cabinet systems
Test telephones and other equipment
For details of the tests, see
Test the System
Test Telephones and Other Equipment
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...