UPS Installation for SCC1 EPN A-Carrier Cabinet
Task List: Install UPS
788
SI Installation and Upgrades
June 2004
Figure 304: UPS for Fiber-Remoted SCC1 EPN
Figure notes
1
110 cross-connect field
2
Utility fail wire pair
3
UPS fail wire pair
4
700A8 (RJ45) modular plug (see
Wire
the 700A8 Plug
on page 786 for wiring
detail)
5
Z3A2 UPS alarm adapter plugs into DB25
connector
6
UPS 800/1000VA
7
EPN control carrier
8
See
Figure 306, Enlarged View of the 110
Cross-Connect Field for the AUX
Connector,
on page 790 for wiring detail
2
1
5
6
7
8
4
3
9
10
AUX
EPN
Control carrier - J58890N
Port carrier - J58890H
Port carrier - J58890H
C
B
A
cydfups4 KLC 092899
6
5
2
1
6
7
8
1
2
3
4
5
6
7
8
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...