Contents
10
SI Installation and Upgrades
June 2004
Register the Switch for Maintenance [from R5/R6/R7/R8si]
127
Check link status [from R5/R6/R7/R8si]
130
Power up DEFINITY LAN Gateway system [from R5/R6/R7/R8si]
130
Power up DEFINITY AUDIX system [from R5/R6/R7/R8si]
130
Resolve alarms [from R5/R6/R7/R8si]
131
Run acceptance tests [from R5/R6/R7/R8si]
131
Test single-carrier cabinet systems
132
Test multi-carrier cabinet systems
132
Test telephones and other equipment
132
Restore announcements (TN750 or TN750B only) [from R5/R6/R7/R8si]
133
Rerecord announcements [from R5/R6/R7/R8si]
133
Check SPE [from R5/R6/R7/R8si]
133
Save announcements and translation [from R5/R6/R7/R8si]
134
Return equipment [from R5/R6/R7/R8si]
134
Helpful links
134
G3V4vs/R5vs/R6vs to
Avaya Communication Manager
135
• Introduction
135
When to use the TN2401 versus the TN2401/2400 sandwich pack
135
Before you begin the upgrade
136
Preparation and process steps
137
Make the Blowback Tape
139
• Task List: DEFINITY vs to Avaya Communication Manager
140
Verify the required hardware [from G3V4vs/R5vs/R6vs]
141
Provide the required tools [from G3V4vs/R5vs/R6vs]
142
Go to the RFA website
143
G3V4 through Release 9si upgrades only
144
Direct connection between the switch and RFA
144
No connection between the switch and RFA
144
If you have problems with RFA
144
Pre-upgrade administration [from G3V4vs/R5vs/R6vs]
145
Unpack and inspect control cabinet [from G3V4vs/R5vs/R6vs]
146
Install new control cabinet [from G3V4vs/R5vs/R6vs]
147
Install new control cabinet with earthquake
protection [from G3V4vs/R5vs/R6vs]
147
Label and connect cables [from G3V4vs/R5vs/R6vs]
149
Install TDM/LAN bus terminators [from G3V4vs/R5vs/R6vs]
150
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...