Test the System
LED Indicators
SI Installation and Upgrades
495
June 2004
Test Tone-Clock for Each Expansion Port Network
Return to Task List
1
Type
test tone-clock
2A
where
2A
is the cabinet and carrier number for one of the Tone-Clocks
installed, and press Enter.
If any result is
FAIL
, check the associated TDM bus cables and intercabinet cables in the
Expansion Port Network (EPN).
2
Repeat Step 1 for each installed Tone-Clock circuit pack.
Test Tone-Clock Interchange for Each Expansion Port Network
Return to Task List
If the system is critical reliability, test the Tone-Clock interchange for each Expansion Port Network
(EPN).
1
If Multi-Carrier Cabinet (MCC1), type
status system
cabinet number <1-44>
and press Enter.
or
If Single-Carrier Cabinet (SCC1), type
status system all-cabinets
and press Enter.
This displays the location of the Standby Tone-Clock.
2
Type
set tone-clock
xx
where
xx
is the Port-Network/Carrier for the Standby Tone-Clock. Press
Enter.
3
If Multi-Carrier Cabinet (MCC1), type
status system
cabinet number <1-44>
and press Enter.
or
If Single-Carrier Cabinet (SCC1), type
status system all-cabinets
and press Enter.
4
Verify the duplicated Tone-Clock is active using the information displayed on the screen.
If any problems are indicated, check the TDM cables in the associated Expansion Port Network (EPN).
Return to Task List
Test Expansion Interface Exchange for Each Expansion Port Network
Return to Task List
If the system is critical reliability, test the expansion interface exchange for each Expansion Port Network
(EPN).
1
If Multi-Carrier Cabinet (MCC1), type
status system
cabinet number <1-44>
and press Enter.
or
If Single-Carrier Cabinet (SCC1), type
status system all-cabinets
and press Enter.
This displays the standby expansion link. See
Figure 190, Sample of System Status before
Expansion Link is Set,
on page 496.
2
Type
set expansion-link
UUCSS
where
UUCSS
is one of the cabinet, carrier, and port locations
of the standby expansion link.
3
Verify the bottom of the screen displays:
Command successfully completed
Command
:
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...