Contents
SI Installation and Upgrades
11
June 2004
Swing existing system into maintenance
position [from G3V4vs/R5vs/R6vs]
150
Check existing software load [from G3V4vs/R5vs/R6vs]
151
Verify system status [from G3V4vs/R5vs/R6vs]
151
Disable scheduled maintenance and alarm
origination [from G3V4vs/R5vs/R6vs]
152
Check link status [from G3V4vs/R5vs/R6vs]
152
Record all links and remove only ISDN
interface links [from G3V4vs/R5vs/R6vs]
153
Save translation [from G3V4vs/R5vs/R6vs]
154
Save recorded announcements (TN750B) [from G3V4vs/R5vs/R6vs]
154
List configuration software version [from G3V4vs/R5vs/R6vs]
155
Shut down DEFINITY LAN Gateway system [from G3V4vs/R5vs/R6vs]
155
Shut down the DEFINITY AUDIX system [from G3V4vs/R5vs/R6vs]
156
Power down existing system [from G3V4vs/R5vs/R6vs]
156
Remove ground connections [from G3V4vs/R5vs/R6vs]
157
Move 25-pair cables from G3V4vs System from G3V4vs/R5vs/R6vs
157
Move management terminal cable from G3V4vs/R5vs/R6vs
157
Move circuit packs from G3V4vs/R5vs/R6vs
158
Verify TDM cables and connectors [from G3V4vs/R5vs/R6vs]
158
Connect control cabinet power and ground [from G3V4vs/R5vs/R6vs]
158
Power up [from G3V4vs/R5vs/R6vs]
159
Deliver or install the License File [from G3V4vs/R5vs/R6vs]
160
New Duplicated G3r installations only
160
New simplex and upgraded G3r only
161
New or upgraded G3si only
161
Direct connection between the switch and RFA
162
No connection between the switch and RFA
162
Administer No-License/Emergency Numbers [from G3V4vs/R5vs/R6vs]
162
Set Daylight Savings rule [from G3V4vs/R5vs/R6vs]
163
Check customer options [from G3V4vs/R5vs/R6vs]
163
High or Critical Reliability
163
All
163
Verify the upgrade [from G3V4vs/R5vs/R6vs]
164
Restore busyouts [from G3V4vs/R5vs/R6vs]
164
Run acceptance tests [from G3V4vs/R5vs/R6vs]
165
Test single-carrier cabinet systems
165
Test multi-carrier cabinet systems
165
Test telephones and other equipment
166
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...