Add IP Solutions
Installing the TN2302AP IP Media Processor
604
SI Installation and Upgrades
June 2004
NOTE:
The customer must provide one CAT5 or better cable for each TN2302AP.
Figure 234: TN2302AP Amphenol Adapter
Return to Task List
Installing the TN2302AP IP Media Processor
To install a TN2302AP IP Media Processor, you must install
•
One or more TN2302AP circuit pack
•
One or more TN799x circuit pack (each TN799x can support more than one TN2302AP)
•
An IP Media Processor adapter.
Required Hardware
Description
Quantity
TN799x C-LAN circuit pack
1
1
1 One TN799x supports more than one TN2302AP.
TN2302AP IP Media Processor
1
TN2302AP Amphenol Adapter
2
2 The adapter has an amphenol connector on one side and an RJ45
connector on the other for connecting to the LAN. See
Figure 234,
TN2302AP Amphenol Adapter,
on page 604.
1
ADPTR-259A connector
1
Figure notes
1
Amphenol connector to backplane
connector corresponding to
TN2302AP slot
2
To Ethernet
3
9-pin connector for maintenance
addfipm2 KLC 083000
1
2
3
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...