Install Fiber Optic Cable Pass-Thru Kit for SCC1 (Single-Carrier) Cabinets
DS1C Converter Complex Administration for TN574 Circuit Packs
216
SI Installation and Upgrades
June 2004
•
DS1CONV-1 Line Compensation — Enter the line compensation (1 to 5) in the A, B, C, and D
columns under the DS1 Converter Facilities heading for each DS1 facility connected to
ENDPOINT-1 (see
Distance to DSX-1 Interface (feet)
).
The DS1 line signal is pre-equalized at the transmitter so that DS1 line pulses are the correct
amplitude and shape when they reach the Network Interface. The amount of equalization
necessary is determined by the distance to the Network Interface (when the endpoint supplies a
DSX-1 interface) and also by the type of wiring used to connect to the Network Interface. The
types of wiring allowed are 22-gauge ABAM (shielded twisted pair) cable, 24-gauge Premises
Distribution System (PDS) wiring, and 26-gauge PDS wiring.
NOTE:
The line equalization setting defaults to 2 and remains in effect until changed by
administration. Because incorrect equalizer settings cause a potentially higher error rate
on the DS1 facility, it is necessary to provide the correct settings based on the distance to
the Network interface.
If it is a TN574 circuit pack, the default for all facilities is 1.
•
DS1CONV-2 Line Compensation
—
Enter the line compensation (1 to 5) in the A, B, C, and D
columns under the DS1 Converter Facilities heading for each DS1 facility connected to
ENDPOINT-2 (see
Distance to DSX-1 Interface (feet)
. The DS1 line signal is pre-equalized at the
transmitter so that DS1 line pulses are the correct amplitude and shape when they reach the
Network Interface. The amount of equalization necessary is determined by the distance to the
Network Interface (when the endpoint supplies a DSX-1 interface) and also by the type of wiring
used to connect to the Network Interface. The types of wiring allowed are 22-gauge ABAM
(shielded twisted pair) cable, 24-gauge Premises Distribution System (PDS) wiring, and 26-gauge
PDS wiring.
•
Facility A Circuit ID
—
Displays when the value in Facility Installed for Facility A is yes.
Enter up to 40 characters to identify the cabinet, carrier, and slot of the DS1 Converter circuit
pack’s physical location.
Similarly, Facility B Circuit ID, Facility C Circuit ID, and Facility D Circuit ID fields display for
each of the DS1 Converter Facilities when yes is entered in the corresponding Facility Installed
field.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...