Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
50
SI Installation and Upgrades
June 2004
Shut down DEFINITY AUDIX system
Return to Task List
A yellow caution sticker on the system’s power unit notifies you to shut down the AUDIX before
powering down the system.
!
WARNING:
Neglecting to shut down an AUDIX assembly before powering down the system cabinet
where it resides can damage the AUDIX disk.
1
Log into the AUDIX as craft.
NOTE:
If you have a dadmin login and password, you can use them instead of craft and the craft
password.
2
Type
reset system shutdown
and press Return.
3
Press Return again to start the shutdown.
The
SHUTDOWN Completed
message appears when the AUDIX is successfully shutdown. This
takes about 2 minutes.
!
WARNING:
If you are leaving the AUDIX System in the carrier, back it out about 2 in. (5 cm) to
eliminate the possibility of damage due to power surges.
Return to Task List
Determine active SPE
NOTE:
Perform this procedure on high and critical reliability systems.
Return to Task List
1
Type
status system 1
and press Return.
2
Determine which side is the active SPE.
3
The standby side should be in the standby state.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...