Release 9si/10si/Communication Manager 1.x to Communication Manager 2.1
Task list: R9si/10si/Communication Manager 1.x to Communication Manager 2.1
40
SI Installation and Upgrades
June 2004
Software compatibility
Before starting the upgrade, always check the Software Release Letter that accompanies the system
removable media. Translation corruption occurs if incompatible software is loaded. Also check the
Minimum Vintage Table, which is included with the letter, before starting the upgrade.
Usable circuit packs
Every circuit pack used must conform to the minimum usable vintage requirements for that system. At a
presale site inspection, the remediation process checks the vintages of existing circuit packs to be reused.
Replace all unusable vintage circuit packs with current vintages.
Refer to the Software Release Letter for information about usable circuit pack vintages. For information
about usable vintages of non-U.S. circuit packs, refer to the ITAC Tech Alert from your regional
distributor.
Wireless systems
If the system uses Wireless Business System, you need to re-enable the radio controllers after the
upgrade. Refer to Chapter 1, “UTAM Disablement” in the DEFINITY® Wireless Business System
Maintenance (555-232-103) book. Refer also to Chapter 2, “Switch Administration” in DEFINITY®
Wireless Business System Installation and Test (555-232-102).
Antistatic protection
CAUTION:
When handling circuit packs or any components, always wear an antistatic wrist ground
strap. Connect the strap to an approved ground such as ground jack.
Task list: R9si/10si/Communication Manager 1.x
to Communication Manager 2.1
Ensure that these tasks are complete before the upgrade visit:
1
Pre-upgrade checklist
2
Go to the RFA website
3
Pre-upgrade administration
Perform these tasks during the upgrade visit:
4
Check SPE
5
Verify the software version
6
Verify system status
7
Disable Scheduled Maintenance and Alarm Origination
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...