Adjuncts and Peripherals
Malicious call trace
SI Installation and Upgrades
835
June 2004
Malicious call trace
The malicious call trace (MCT) voice recorder connects directly to the tip and ring connections of a
TN763/D auxiliary trunk circuit pack. See
Figure 326
. The 909A/B universal coupler provides seizure
control to the recorder.
Figure 326: Malicious call trace
NOTE:
A wiring block must be locally engineered.
NOTE:
909A couplers ships with one DW4B-DE cable and two DW8B-SE cables. The 909B
ships with one KS-22911L2 power supply, one DW4B-DE cable, and two DW8B-SE
cables.
1
Determine the port assignment of the recorder from the malicious call tracing form.
2
Install the 909A/B universal coupler on a vertical surface.
3
Connect the SZ, SZ1, S, and S1 leads from the 909A/B to an auxiliary trunk circuit pack.
a
Tip and ring connect from the voice recorder to the auxiliary trunk circuit pack (J1 on the
909A/B).
b
CBS1/C1 and CBS2/C2 connect from the voice recorder to J2 on the 909A/B.
Figure notes
1
Malicious call trace voice recorder
2
25-pair cable (T, R, S, S1, Sz, SZ1) to
TN763/D auxiliary trunk circuit pack
3
909A/B universal coupler
4
Power supply for universal coupler
5
To SZ1 on TN763/D connector
6
Tip and ring wires
7
CBS1/C1 and CBS2/C2
cydf038 PDH 091696
J2
J3
J1
5
2
7
7
8
2
3
6
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...