G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
170
SI Installation and Upgrades
June 2004
Rerecord announcements [from
G3V4vs/R5vs/R6vs]
Return to Task List
If you have not saved and restored announcements during the upgrade, the customer must re-record all
announcements now.
If the customer changed any announcements after the they provided the source tape for the blowback
flash card, the customer must re-record the new announcements.
Return to Task List
Save announcements and translation [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
Remove the original translation card(s) from the TN2401 NetPkt circuit packs. These cards are
not formatted to be used with the new TN2401.
2
Insert the new translation card(s) into the TN2401 circuit packs.
3
Type
save announcements
and press Enter.
NOTE:
Use this step only for systems equipped with the TN750 or TN750B announcement circuit
pack.
This takes about 45 minutes.
4
Type
save translation
and press Enter to copy upgraded translations in memory to the new
translation card, which takes about 20 minutes.
NOTE:
It takes longer to save translations to the new, larger flashcards.
NOTE:
Do not press any keyboard key until after the screen displays the success message. For
example, if you press Enter more than once after typing the command, the second Enter
erases the screen and you never see the success message.
NOTE:
If the
save translation
command fails, do not continue. Record the error code that appears
on the screen and escalate the problem immediately.
Keep the translation media in a safe and secure place.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...