R5/R6/R7/R8si to Avaya Communication Manager
Task List: R5/R6/R7/R8si to Avaya Communication Manager
SI Installation and Upgrades
105
June 2004
•
CALA: https://cala-businesspartner.avaya.com/mnc/index.html
•
EMEA: https://emea-businesspartner.avaya.com/
•
APAC: http://www.avaya-apac.com/bp
— Contractors go to http://www.avaya.com/services/rfa/
— If you are unable to access RFA using your recommended portal, try:
http://rfa.avaya.com
2
Using your SSO, log in to the RFA website.
3
Follow the links to the RFA Information page.
4
Complete the information necessary to create a License File.
NOTE:
If you have problems with a hardware serial number that is not in the SAP database, go to
the
If you have problems with RFA
section.
G3V4 through Release 9si upgrades only
Direct connection between the switch and
RFA
If you are upgrading from G3V4 through Release 9si and you have a direct connection between the
switch and RFA:
1
Using your RFA Job Aids, run the Features Extraction Tool (FET) from the RFA website to create
a Switch Configuration File.
2
When prompted, type in the Transaction ID number.
3
The FET creates and uploads the Switch Configuration File automatically.
4
Do not deliver the License File at this time. You will deliver and install it later in this upgrade
procedure.
No connection between the switch and RFA
If you are upgrading from Release 9si and you do not have a direct connection between the switch and
RFA:
1
Run the Features Extraction Tool (FET) from your laptop/PC to create a Switch Configuration
File.
2
When prompted, type in the Transaction ID number.
3
Use the FET instructions to create a new switch connection profile.
4
Create the Switch Configuration File.
5
Upload the Switch Configuration File to the RFA website.
6
Deliver the License File to your laptop/PC for installation later in this procedure.
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...