Install and Wire Telephone Power Supply
Important Warning for 1145B Power Supply
558
SI Installation and Upgrades
June 2004
1
Set the spacer bracket onto the mounting plate and secure with the #8-32 x 1/2-inch shoulder
screws. The spacer bracket is not shown in the figure but is installed behind the top power
distribution unit.
2
Slide the keyhole slots in the power distribution unit over the shoulder screws.
3
Insert the #8-32 x 1 inch screw through the distribution unit, through the spacer bracket, and into
the plate. The mounting hole is located just above the wire clip. Tighten the screw securely.
4
Set the battery back-up switch to the 1-32 (down) position.
5
Power-down the 1145B unit as described on the label on the side of the unit.
6
Remove the output power cable between the 1145B and the 1146B units. The cable will not be
reused.
7
Connect the P1 connector end of the “T” cable to the bottom power distribution unit. Connect the
P2 connector to the top distribution unit. Connect the P3 connector to the 1145B.
8
Power-up the 1145B as described on the label on the side of the unit.
Figure 222: Expanded Power Distribution Unit
Return to Task List
Figure notes
1
Wall-Mounting Plate
2
Second 1146B Power Distribution Unit
3
“T” Cable (H600-347-G7)
4
First 1146B Power Distribution
Unit
5
1145B Power Unit
1145 Powe r U nit
1 149 Ba ttery
O n Ba ttery R e serve
C ha rg in g B atter y
O u tpu t Pow er O n
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
-4 8V
-4 8V
R T N
RT N
U nit N o.
C onnected To:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
-4 8V
-4 8V
RT N
RT N
U nit N o.
C onnected To:
0 00 4 _1 PD H 0 62 59 6
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...