Install and Wire Telephones
Off-Premises Connections
528
SI Installation and Upgrades
June 2004
Figure 204: Connections to 24 Out-of-Building Telephones
Return to Task List
Off-Premises Protection Requirements
Return to Task List
Both building entrances require carbon block or equivalent protection and sneak current protection.
Protection can be provided by:
•
a 4-type protector, which is equipped with a heat coil
•
a 3-type protector plus a separate sneak current protector
The 4-type protector is the preferred device. For installations not using primary protection, 4-type
protectors should always be used. When the 3-type protector is already installed, a separate sneak current
protector is required.
Figure notes
1
Locally Engineered Cables and Equipment
2
25-Pair Connector
3
Multi-Pair Protector Units (Primary
Protectors with Heat Coils or Equivalent
with Sneak Current Protection)
4
B25A Cable (Male to Female)
5
Concentrator Cable (WP90929 List 1)
6
356A Adapter
7
Out-of-Building Wiring
8
Out-Of-Building Analog Telephones
9
Part of Main Distribution Frame
(MDF)
10
Station Side
11
System Side
12
White Field
13
Purple Field
14
Cross-Connect Jumpers
15
Tip and Ring Wires
crdf24o CJL 101396
8
7
1
9
10
11
12
13
14
15
16
2
2
4
4
4
4
6
6
5
3
3
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...