Install and Connect MCC1 (Multicarrier) Cabinet
Task List: Connect DC Power and Ground
352
SI Installation and Upgrades
June 2004
Figure 100: Typical Power and Ground for a Mixed AC/DC-Powered Cabinet
Return to Task List
Connect Remote Power Off Cable
Return to Task List
Figure 101, Remote Power Off Cable Connections — Part 1,
on page 353 shows the location of the
Remote Power Off (RPO) cable. The opposite end of the cable connects to the Emergency Power Off
(EPO) switch located outside of the equipment room.
Even though the equipment room EPO switch disconnects main AC power to the equipment room, it
cannot disconnect the battery power from the J58890CH. An auxiliary set of contacts inside the EPO are
used for this function.
1
Plug the RPO cable into the connector shown in
Figure 101, Remote Power Off Cable
Connections — Part 1,
on page 353.
2
Route the opposite end of the wires to the EPO switch. The opposite end of the RPO cable
connects to the internal relay.
NOTE:
The EPO switch and the auxiliary contacts (inside the EPO switch assembly) are
customer-provided.
CAUTION:
The auxiliary contacts inside the EPO switch assembly must
close
when the switch is
pressed. This contact closure energizes the relay inside the power distribution unit,
causing the connection to the battery holdover assembly to open.
Approved
ground
1 AWG (44 mm
2
) up to
50 feet (15.2 m) or engineered for
less than 0.5 volt drop per conductor
To AC
power source
EPN
cabinet
AC power-
distribution unit
Cabinet
ground block
-48V
-48V RTN
PPN
cabinet
75A
-48V
DC power
supply
System
single-point
ground
Coupled
bonding conductor
To CBC terminal
block at MDF
AC power cord
cydfacdc KLC 032999
Ground
discharge
bar
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...