G3V4vs/R5vs/R6vs to Avaya Communication Manager
Task List: DEFINITY vs to Avaya Communication Manager
SI Installation and Upgrades
171
June 2004
Disassemble the G3V4vs System [from
G3V4vs/R5vs/R6vs]
Return to Task List
1
Remove any unused 25-pair cables from the rear of the system.
2
Loosen the 4 shoulder screws that hold the cabinet to the mounting plate (see
Figure 8, Exploded
view of DEFINITY vs cabinet,
on page 171).
3
Remove the locking screw that holds the cabinet to the center of the mounting plate.
4
Return the system cabinet to its locked operating position.
5
Align the 4 shoulder screws with the keyhole slots and remove the cabinet from the mounting
plate.
6
Remove the 5 lower wood screws from the wall plate and loosen the top 2 wood screws.
7
Remove the mounting assembly.
8
Remove the top 2 wood screws.
Figure 8: Exploded view of DEFINITY vs cabinet
Return to Task List
Figure notes
1
Shoulder screws
2
Compact single-carrier cabinet
3
Plywood sheet
4
Wall-mounting plate with keyhole slots
5
Cabinet support bracket
6
Locking screws on spring-loaded housing
3
4
5
1
6
2
g3vs-2 LJK 030996
Содержание MCC1
Страница 38: ...Upgrades to Avaya Commnication Manager Made Easy Before you start 38 SI Installation and Upgrades June 2004 ...
Страница 326: ...Installation for MCC1 Multicarrier Cabinets Made Easy 326 SI Installation and Upgrades June 2004 ...
Страница 362: ... Single Carrier Cabinets Made Easy 362 SI Installation and Upgrades June 2004 ...
Страница 498: ...Test the System LED Indicators 498 SI Installation and Upgrades June 2004 ...
Страница 650: ...Add IP Solutions Task list Upgrade a TN802 to a TN802B 650 SI Installation and Upgrades June 2004 ...
Страница 692: ...Install and Administer Trunks Add TN1654 DS1 Converter r only 692 SI Installation and Upgrades June 2004 ...
Страница 770: ...Connecting and Handling Fiber Optic Cables Cleaning Fiber Optic Cables 770 SI Installation and Upgrades June 2004 ...
Страница 784: ...Connector and Cable Diagrams Pinout Charts DS1 Interface Cable H600 307 784 SI Installation and Upgrades June 2004 ...
Страница 792: ...UPS Installation for SCC1 EPN A Carrier Cabinet Task List Install UPS 792 SI Installation and Upgrades June 2004 ...
Страница 874: ...Index Z 874 SI Installation and Upgrades June 2004 ...